Daytime Noise Monitoring Results -- Normal weekday            
Station M8, Wah Lai House                    
Date Start Time End Time  Weather Noise level (dB(A)), 30 min Major Construction Noise Source(s) Observed Other Noise Source(s) Observed Remarks Temp. (°C) Wind Speed (m/s) Noise Meter Model / ID Calibrator Model / ID
Leq L10 L90
10-Sep-10 09:48 10:18 Sunny 75 78 69 No major construction works Road Traffic noise from Shek Pai Wan Road and pipe ramming operation N.A 28.1 <5 B&K 2238   S/N : 2684503 B&K 4231  S/N: 2385180
16-Sep-10 09:43 10:13 Sunny 65 66 63 Grouting works Road Traffic noise from Shek Pai Wan Road. N.A 28.9 <5 B&K 2238   S/N : 2684503 B&K 4231  S/N: 2385180
22-Sep-10 13:49 14:19 Cloudy 66 67 64 Grouting works Road Traffic noise from Shek Pai Wan Road. N.A 25.4 <5 B&K 2238   S/N : 2684503 B&K 4231  S/N: 2385180
28-Sep-10 09:58 10:28 Sunny 65 67 64 Grouting works Road Traffic noise from Shek Pai Wan Road. N.A 28.6 <5 B&K 2238   S/N : 2684503 B&K 4231  S/N: 2656516
      Min. 65                
      Max. 75